Skip to content
verify mcp Beta VerifyMCP is currently in beta. If you notice any issues, email [email protected] and we’ll put it right.

VoltPlan Wiring Diagrams

REMOTE · MCP.VOLTPLAN.APP · 2 COMPONENTS · SCANNED AUG 3

Generate 12V/24V/48V wiring diagrams and size wires, fuses, batteries, solar, and inverters.

+4 this week 66 Trust /100
Trust breakdown (6 categories)

How this component scores in each security and reliability category. Every signal is checked automatically against the live server, and we only credit what we can confirm. How we score →

Endpoint Security57
Transport & Reachability100
Schema Quality & AI Usability69
  • AI-judged instruction clarity (excellent).Pass
  • Context-footprint check failed: tool/resource definitions use about 1411 tokens (~156/item across 9 items; 9 tools + 0 resources), over budget; trim descriptions and params. See how to fix → Fail
  • Usage-examples check failed: none of the tools include examples. See how to fix → Fail
Stability & Change Management27
  • Stability observed for 8 of 30 days with no destabilising changes; credit accrues until the full window elapses.Partial
Tool Coverage100
  • 100% of tools have a non-trivial description (not blank, and not just the tool's name).Pass
  • 100% of tool parameters carry a description.Pass
Capabilities100
  • Implements a supported MCP spec version (2025-11-25); the latest is 2026-07-28.Pass
Install

Add this component to your MCP client. Where a client-specific snippet is available, pick your client below and copy it straight into your config; otherwise use the connection detail shown.

remote · mcp.voltplan.app

# add to Claude Code
claude mcp add --transport http yuzu-hub-wiring-diagram-mcp https://mcp.voltplan.app/mcp
# ~/.codex/config.toml
[mcp_servers.yuzu-hub-wiring-diagram-mcp]
url = "https://mcp.voltplan.app/mcp"
// opencode.json
{
  "$schema": "https://opencode.ai/config.json",
  "mcp": {
    "yuzu-hub-wiring-diagram-mcp": {
      "type": "remote",
      "url": "https://mcp.voltplan.app/mcp",
      "enabled": true
    }
  }
}
# add to OpenClaw
openclaw mcp add yuzu-hub-wiring-diagram-mcp --url https://mcp.voltplan.app/mcp --transport streamable-http
# ~/.hermes/config.yaml
mcp_servers:
  yuzu-hub-wiring-diagram-mcp:
    url: "https://mcp.voltplan.app/mcp"
// mcp.json
{
  "mcpServers": {
    "yuzu-hub-wiring-diagram-mcp": {
      "type": "http",
      "url": "https://mcp.voltplan.app/mcp"
    }
  }
}

The mcpServers block is a cross-client convention. Remote transports vary, so check your client's docs.

Changelog

Every change we have recorded for this component, newest first. Security-relevant changes are always shown. ▲ marks a change for the better, ▼ a change for the worse; unmarked changes are neutral.

  • 3 Aug 26 +1

    No change was recorded against any check on this day. Stability & Change Management went from 23 to 27. That category is still filling its 30-day observation window: 7 days of observed history at the previous scan, 8 at this one. The score rises as the window fills, whether or not the server changes.

  • 1 Aug 26 +1

    No change was recorded against any check on this day. Stability & Change Management went from 17 to 20. That category is still filling its 30-day observation window: 5 days of observed history at the previous scan, 6 at this one. The score rises as the window fills, whether or not the server changes.

  • 31 Jul 26 0
    • We updated how we score, so this day's move reflects our rubric, not a change to the server See what changed → functional
  • 30 Jul 26 0
    • We updated how we score, so this day's move reflects our rubric, not a change to the server See what changed → functional
  • 29 Jul 26 +1

    No change was recorded against any check on this day. Stability & Change Management went from 7 to 10. That category is still filling its 30-day observation window: 2 days of observed history at the previous scan, 3 at this one. The score rises as the window fills, whether or not the server changes.

  • 28 Jul 26 +1

    No change was recorded against any check on this day. Stability & Change Management went from 3 to 7. That category is still filling its 30-day observation window: 1 days of observed history at the previous scan, 2 at this one. The score rises as the window fills, whether or not the server changes.

  • 27 Jul 26 0
    • We updated how we score, so this day's move reflects our rubric, not a change to the server See what changed → functional
  • 26 Jul 26 62

    First indexed and scored.

Diagnostics

Diagnostic detail from the automated scan of this channel: what the scanner observed at each step, so you can see exactly where a check passed or failed. It is informational only and never changes the trust score.

Captured 3 Aug 2026 · Probed https://mcp.voltplan.app/mcp

TLS valid

Negotiated TLS 1.3 with TLS_AES_128_GCM_SHA256 .

Subject Issuer Valid from Valid until Key Signature Serial
CN=mcp.voltplan.app CN=YR1,O=Let's Encrypt,C=US 25 Jul 2026 23 Oct 2026 RSA 4096 SHA256-RSA 6b16252400c90567e76d4337ff92093d6d4
SANs: mcp.voltplan.app
CN=YR1,O=Let's Encrypt,C=US (CA) CN=Root YR,O=ISRG,C=US 3 Sept 2025 2 Sept 2028 RSA 2048 SHA256-RSA a20253f15f2691c05dc1ce13b9bcca4e
CN=Root YR,O=ISRG,C=US (CA) CN=ISRG Root X1,O=Internet Security Research Group,C=US 13 May 2026 2 Sept 2032 RSA 4096 SHA256-RSA f24b6d17f9d9ad7cb1c9fea78782699f
DNSSEC insecure

Validation of mcp.voltplan.app. Not signed

Zone DS Keys Algorithms Outcome
. trust_anchor 20326, 38696 8, 8 Verified
app. present 23684 8 Verified
voltplan.app. absent Unsigned (proven) parent-signed NSEC/NSEC3 proves an unsigned delegation
Authentication No authorisation required

The endpoint answered without asking for a token. Anyone who knows the URL can reach it.

Result No authorisation required
HTTP status 200
Transports 2 probes
Transport URL Outcome Status Location
streamable-http https://mcp.voltplan.app/mcp Verified 200
http (plaintext) http://mcp.voltplan.app/mcp HTTPS enforced 302 https://mcp.voltplan.app/mcp
MCP tools — 9 exposed · ~1,411 tokens

The tools this component advertises to a client, with an estimated token cost for each. Expand a tool to see its parameters and schema. The per-tool counts are indicative and are not scored directly; the schema's total context footprint is one signal in Schema Quality & AI Usability.

Tool Tokens
calculate_battery_bank ~222

Calculate the recommended battery bank size based on daily energy consumption. Accounts for days of autonomy (how many days without charging) and depth of discharge. Returns required capacity, number of batteries, and wiring configuration.

NameTypeReqDescription
dailyConsumptionWhnumberyesDaily energy consumption in watt-hours (from calculate_power_budget)
daysOfAutonomynumberDays the system should run without any charging (default: 2)
depthOfDischargePercentnumberUsable percentage of battery capacity. LiFePO4: 80-90%, AGM: 50%, Gel: 50% (default: 80)
singleBatteryAhnumberyesCapacity of a single battery in amp-hours (e.g. 100, 200)
singleBatteryVoltagenumberyesVoltage of a single battery (e.g. 12.8 for LiFePO4, 12 for lead-acid)
systemVoltagenumberyesTarget system voltage in volts (e.g. 12, 24, 48)

No output schema declared.

No examples provided.

calculate_battery_config ~155

Determine how to arrange batteries in series and/or parallel to achieve a target voltage and capacity. Returns the number of batteries needed, the wiring configuration (e.g. 2S3P), and step-by-step wiring instructions.

NameTypeReqDescription
singleBatteryAhnumberyesCapacity of one battery in amp-hours
singleBatteryVoltagenumberyesNominal voltage of one battery (e.g. 12.8 for LiFePO4, 12 for lead-acid, 3.2 for LiFePO4 cells)
targetCapacityAhnumberyesDesired total capacity in amp-hours
targetVoltagenumberyesDesired system voltage (e.g. 12, 24, 48)

No output schema declared.

No examples provided.

calculate_charging_time ~218

Estimate how long it takes to charge a battery bank from a given state of charge to a target level. Accounts for the bulk charging phase (constant current, up to ~80% SoC) and the slower absorption phase (tapering current, 80-100% SoC). Works for any charging source: solar, shore power, alternator.

NameTypeReqDescription
batteryCapacityAhnumberyesTotal battery bank capacity in amp-hours
batteryVoltagenumberyesBattery bank voltage (e.g. 12, 24, 48)
chargeCurrentAmpsnumberMaximum charge current in amps (if limited by the charger or battery BMS). If omitted, calculated from power and voltage.
chargePowerWattsnumberyesCharger output power in watts
currentStateOfChargePercentnumberyesCurrent state of charge in percent (e.g. 20 for 20%)
targetStateOfChargePercentnumberTarget state of charge in percent (default: 100)

No output schema declared.

No examples provided.

calculate_inverter_size ~112

Calculate the recommended inverter size for running AC loads from a DC battery system. Accounts for continuous power, startup surge power (motors typically surge 2-3x), and includes a 25% headroom for the continuous rating. Returns the recommended inverter wattage and the DC current draw at system voltage.

NameTypeReqDescription
loadsarrayyesList of AC loads that will run through the inverter
systemVoltagenumberyesDC system voltage (e.g. 12, 24, 48)

No output schema declared.

No examples provided.

calculate_power_budget ~111

Calculate total daily energy consumption from a list of electrical loads. Each load specifies its power draw, how many hours per day it runs, and quantity. Returns total daily energy (Wh and Ah), peak power draw, and average power. This is typically the first step in sizing a battery bank and solar system.

NameTypeReqDescription
loadsarrayyesList of electrical loads to include in the budget
systemVoltagenumberyesSystem voltage in volts (e.g. 12, 24, 48)

No output schema declared.

No examples provided.

calculate_solar_size ~164

Calculate the required solar panel wattage to cover daily energy consumption. Accounts for peak sun hours at the location and system efficiency losses (MPPT conversion, wiring, temperature derating). Returns required wattage and common panel configurations.

NameTypeReqDescription
dailyConsumptionWhnumberyesDaily energy consumption in watt-hours (from calculate_power_budget)
peakSunHoursnumberyesAverage daily peak sun hours for the location. Examples: Northern Europe winter 1-2h, summer 4-6h. Southern US 5-6h. Equatorial regions 5-7h.
systemEfficiencynumberOverall system efficiency factor (default: 0.85). Accounts for MPPT losses, wiring losses, temperature derating, and panel soiling.

No output schema declared.

No examples provided.

calculate_wire_gauge ~238

Calculate the recommended wire gauge / cable cross-section for a DC circuit. Considers both ampacity (current carrying capacity) and voltage drop to recommend the optimal cable size. Also returns total resistance, power loss, and a fuse recommendation. Supports copper conductors from 0.75 mm² (18 AWG) to 240 mm² (300 MCM).

NameTypeReqDescription
cableLengthMnumberyesOne-way cable length in meters
currentnumberLoad current in amps. Provide either current or power.
isRoundTripbooleanAccount for both positive and negative conductor (default: true). Set to false for chassis-ground returns.
maxVoltageDropPercentnumberMaximum acceptable voltage drop in percent (default: 3%)
powernumberLoad power in watts. Will be converted to current using the voltage. Provide either current or power.
temperatureCelsiusnumberAmbient temperature in °C (default: 20°C). Affects copper resistance.
voltagenumberyesSystem voltage in volts (e.g. 12, 24, 48)

No output schema declared.

No examples provided.

generate_wiring_diagram ~153

Generate an electrical wiring diagram for campers, boats, or off-grid setups. Returns a complete schematic with batteries, chargers, protection components, and loads. Protection components (shunt, main switch, low-voltage cutoff) are auto-generated when both batteries and loads are provided.

NameTypeReqDescription
batteriesarrayBatteries in the system
chargersarrayChargers with their power sources
formatstringOutput format: svg (recommended, renders inline) or png (base64-encoded image, may not display in all clients)
loadsarrayElectrical loads / consumers
systemNamestringyesName of the electrical system (e.g. "My Camper Van")

No output schema declared.

No examples provided.

list_component_types ~38

List all available component types and example configurations for building wiring diagrams. Use this to understand what parameters are needed before calling generate_wiring_diagram.

Input schema present but exposes no named parameters.

No output schema declared.

No examples provided.