Skip to content
verify mcp Beta VerifyMCP is currently in beta. If you notice any issues, get in touch and we’ll put it right.

Georgia Energy

NPM · @PIPEWORX/MCP-GEORGIA-ENERGY · 2 COMPONENTS

Georgia (country) electricity system — live grid telemetry and regulator statistics.

+3 this week 83 Trust /100

Last scanned (7 hours ago)

Scores higher than 76% of npm servers

Category Cloud Infrastructure

Trust breakdown (7 categories)

How this component scores in each security and reliability category. Every signal is checked automatically from public evidence about the published package, including repeated runs of it in an isolated sandbox, and we only credit what we can confirm. How we score → Why this is hard to score →

Supply Chain Security100
  • No malware found by supply-chain analysis.Pass
  • No known CVEs affecting this package version or its production dependencies.Pass
  • No install/post-install scripts declared.Pass
  • No production dependencies, so there is no dependency health to assess. View diagnostics → Pass
Provenance & Transparency97
  • Source repository is publicly reachable at the declared URL. View diagnostics → Pass
  • Cryptographically verified build provenance (signed, bound to pipeworx-io/mcp-georgia-energy). View diagnostics → Pass
  • Clear OSI-approved license (MIT).Pass
  • Actively maintained (last published 3 days ago).Pass
  • Disclosure check failed: no security disclosure policy was found in the source repository. See how to fix → Fail
Schema Quality & AI Usability70
  • AI-judged instruction clarity (excellent).Pass
  • Context-footprint check failed: tool/resource definitions use about 1373 tokens (~171/item across 8 items; 8 tools + 0 resources), over budget; trim descriptions and params. See how to fix → Fail
  • Usage-examples check failed: none of the tools include examples. See how to fix → Fail
Stability & Change Management23
  • Stability observed for 7 of 30 days with no destabilising changes; credit accrues until the full window elapses.Partial
Tool Coverage100
  • 100% of tools have a non-trivial description (not blank, and not just the tool's name).Pass
  • 100% of tool parameters carry a description.Pass
Tool Safety100
  • No prompt-injection markers were found in the server instructions, tool names or descriptions we captured.Pass
  • We read all 8 captured tool definition(s), and no name or description among them implies an irreversible operation.Pass
  • An AI judge read all 9 captured unit(s) of tool text and found none that tries to manipulate the model reading it.Pass
Capabilities100
  • Implements a supported MCP spec version (2025-11-25); the latest is 2026-07-28.Pass
Changelog

Every change we have recorded for this component, newest first. Security-relevant changes are always shown. ▲ marks a change for the better, ▼ a change for the worse; unmarked changes are neutral.

  • 4 Nov 26 +1

    No change was recorded against any check on this day. Stability & Change Management went from 17 to 20. That category is still filling its 30-day observation window: 5 days of observed history at the previous scan, 6 at this one. The score rises as the window fills, whether or not the server changes.

  • 3 Nov 26 0
    • Security disclosure: unverified → fail ▼ functional
  • 2 Nov 26 +1
    • Security disclosure: fail → unverified ▼ functional
    • Package version: 0.2.0 → 0.2.1 functional
  • 31 Oct 26 +1

    No change was recorded against any check on this day. Stability & Change Management went from 3 to 7. That category is still filling its 30-day observation window: 1 days of observed history at the previous scan, 2 at this one. The score rises as the window fills, whether or not the server changes.

  • 29 Oct 26 80

    First indexed and scored.

Diagnostics

Diagnostic detail from the automated scan of this channel: what the scanner observed at each step, so you can see exactly where a check passed or failed. It is informational only and never changes the trust score.

Captured 5 Nov 2026 · Analysed npm/@pipeworx/mcp-georgia-energy@0.2.1

Provenance Verified

A signed build attestation was found and verified, binding this exact artifact to the source repository it claims to come from.

Result Verified
Ecosystem npm
Reason Verified
Discovered via Registry attestation endpoint
Source repo pipeworx-io/mcp-georgia-energy
Certificate issuer https://token.actions.githubusercontent.com
Certificate SAN https://github.com/pipeworx-io/mcp-georgia-energy/.github/workflows/publish.yml@refs/heads/main
Rekor log index 3637323931
Predicate type SLSA build provenance https://slsa.dev/provenance/v1
Subject digest sha512:6be038e8526f013dbbfa2b2464112bfdbda1784be23814db674c9982843effda979560918ca5f9f7450d3bff9b68fbaca6222deb8da18d262f1291419

Background: How many MCP packages publish verified provenance →

Dependencies 0 packages
Packages resolved 0
Tree resolution Complete

Background: SBOMs and build attestations, explained →

MCP tools · 8 exposed · ~1,319 tokens

The tools this component advertises to a client, with an estimated token cost for each. Expand a tool to see its parameters and schema. The per-tool counts are indicative and are not scored directly; the schema's total context footprint is one signal in Schema Quality & AI Usability. A tool's description is untrusted text the model reads on every call, which is what makes this list a security surface and not just an inventory: how tool poisoning works →

Tool Tokens
gnerc_prices ~142

Monthly Georgian electricity prices set or recorded by the Georgian National Energy and Water Supply Regulatory Commission (GNERC), 2015 to 2026, in tetri per kWh: the average balancing-electricity sale price, the guaranteed-capacity fee, and the price ESCO paid deregulated power stations.

NameTypeReqDescription
seriesstringyesWhich price series. 'balancing' = average sale price of balancing electricity; 'capacity_fee' = guaranteed capacity fee; 'deregulated' = price ESCO paid deregulated stations.
yearinteger–Restrict to one year, 2015-2026. Omit for the whole series.

No output schema declared.

No examples provided.

gnerc_station_generation ~222

Monthly electricity generation for individual Georgian power stations — Enguri HPP, the Vardnili cascade, Khrami 1 and 2, Zhinvali, Gardabani thermal 1 and 2, the Kartli wind farm, named solar plants — plus national supply, consumption, import, export and named large direct consumers, in million kWh. Sourced from the Georgian National Energy and Water Supply Regulatory Commission (GNERC) actual-balance workbook, covering 2015 to 2026. Station names are published in Georgian script; each row keeps its original name and its position in the balance hierarchy.

NameTypeReqDescription
limitinteger–Maximum rows to return. Default 100, max 400.
querystring–Optional substring filter on the Georgian row label, e.g. "ჰესი" for hydro stations or "ენგურ" for Enguri. Matching is case-insensitive and accent-blind on the Georgian text as published.
yearintegeryesCalendar year, 2015-2026.

No output schema declared.

No examples provided.

gse_demand_forecast ~102

Georgia's day-ahead electricity forecast published by JSC Georgian State Electrosystem: hour-by-hour total consumption, total supply, thermal / hydro (regulated and seasonal) / wind generation, and planned import and export, in MWh. Published daily, typically a day ahead.

NameTypeReqDescription
datestring–The forecast date as 'YYYY-MM-DD'. Defaults to today in Tbilisi. Tomorrow is usually already published; older dates stay available.

No output schema declared.

No examples provided.

gse_frequency ~107

The Georgian power system's electrical frequency in hertz, from the JSC Georgian State Electrosystem 1-minute real-time export — nominal 50 Hz, and how far it sits from nominal is a direct read on the balance between generation and demand. Carries the same ACT/SUB/NRE quality flag as the grid export.

NameTypeReqDescription
max_lookback_slotsinteger–How many 1-minute slots to walk back looking for the most recent published reading. Default 15.

No output schema declared.

No examples provided.

gse_grid_at ~200

Georgia's national grid state at a specific past time — the same generation, tie-line and consumption blocks as gse_grid_now, with the same QUALITY flags, for one 3-minute slot. Sourced from the JSC Georgian State Electrosystem real-time export, which is retained for a rolling ~30 days; earlier timestamps are gone. Timestamps are Tbilisi local time (UTC+4) unless timezone is set to utc. If that exact slot was never published this reports the miss rather than substituting a nearby one.

NameTypeReqDescription
timestampstringyesThe moment to read, as 'YYYY-MM-DD HH:MM' or 'YYYY-MM-DDTHH:MM' or 'DD.MM.YYYY HH:MM'. Minutes are floored to the 3-minute grid GSE publishes on.
timezonestring–How to read the timestamp. Default 'tbilisi', which is how GSE names the files.

No output schema declared.

No examples provided.

gse_grid_now ~189

Georgia's national electricity grid right now: hydro, thermal, wind and solar generation, total generation, cross-border flow on the Azerbaijan, Armenia, Russia (Salkhino/Java/Nakaduli lines) and Turkey tie lines, and total consumption — in MW as a 3-minute moving average. Sourced from the JSC Georgian State Electrosystem real-time system export, published every 3 minutes. Every value carries its QUALITY flag: ACT means actual telemetry, SUB means the operator substituted a figure and NRE means telemetry was not received, so SUB and NRE values are NOT measurements and must not be reported as such.

NameTypeReqDescription
max_lookback_slotsinteger–How many 3-minute slots to walk back looking for the most recent published export. Publication lags a few minutes, so the current minute usually does not exist yet. Default 10 (30 minutes).

No output schema declared.

No examples provided.

gse_publications ~222

Reports and notices published by JSC Georgian State Electrosystem, Georgia's transmission system operator — including the Generation Adequacy Assessment (the medium and long-term supply-adequacy outlook), annual reports, independent auditor's reports, donor-organisation reports and the Strategic Environmental and Social Assessment. Also covers the operator's news and announcements. Available in English and Georgian.

NameTypeReqDescription
category_idinteger–Filter to one category. 3 = Annual Reports, 5 = Independent Auditor's Annual Report, 6 = Generation Adequacy Assessment, 7 = Donor Organizations' Reports, 8 = SESA, 1 = News, 2 = important news. Call…
collectionstring–Which collection to list. Default 'publications'.
langstring–Language. Default 'en'.
pageinteger–Page number, 1-based. Default 1.
per_pageinteger–Items per page. Default 10, max 50.

No output schema declared.

No examples provided.

gse_tenders ~135

Procurement tenders run by JSC Georgian State Electrosystem, the Georgian electricity transmission system operator — substation and transmission-line construction, primary equipment supply, consultancy — with the awarded bidder, contract reference and bid prices where GSE has published them. Available in English and Georgian.

NameTypeReqDescription
langstring–Language. Default 'en'.
pageinteger–Page number, 1-based. Default 1.
per_pageinteger–Items per page. Default 10, max 50.
yearinteger–Restrict to one publication year. Available years are listed in the response.

No output schema declared.

No examples provided.

Install

How do I install the Georgia Energy MCP server?

Georgia Energy runs locally as an npm package, launched with npx -y @pipeworx/mcp-georgia-energy. Ready-made configuration for Claude, Cursor, VS Code, Codex and 5 more is on this page, copied from each client's own documentation.

npm · @pipeworx/mcp-georgia-energy

# add to Claude Code
claude mcp add pipeworx-io-georgia-energy -- npx -y @pipeworx/mcp-georgia-energy
Common questions

What is the Georgia Energy MCP server?

Georgia Energy is an MCP server listed in the public MCP registry as io.github.pipeworx-io/georgia-energy. Georgia (country) electricity system, live grid telemetry and regulator statistics. This page covers its npm package (@pipeworx/mcp-georgia-energy).

Is the Georgia Energy MCP server safe to use?

Georgia Energy scores 83 out of 100 on VerifyMCP. We found no known CVEs affecting it as of 5 November 2026. It declares no install or post-install scripts. Its build provenance is signed and verified. That is a record of what we were able to check automatically, not an endorsement. The category breakdown on this page shows every signal behind the number, including the ones we could not confirm.

What tools does the Georgia Energy MCP server expose?

Georgia Energy exposes 8 tools: gse_grid_now, gse_grid_at, gse_frequency, gse_demand_forecast, gse_publications, and 3 more. Their descriptions and schemas cost roughly 1,319 tokens of context every time the server is loaded.

Is the Georgia Energy MCP server still maintained?

Georgia Energy is still listed as active in the MCP registry. We last reached this channel on 5 November 2026. Those dates come from our own scans of the registry and the channel itself, not from anything the publisher announced.

What licence is the Georgia Energy MCP server under?

Georgia Energy declares the MIT licence, which is OSI-approved. That covers the source only, and says nothing about the cost of any service it calls.