Skip to content
verify mcp Beta VerifyMCP is currently in beta. If you notice any issues, get in touch and we’ll put it right.

Energy Projects AU Commercial Solar Assessment

REMOTE · ENERGY-PROJECTS.COM.AU

Indicative commercial rooftop solar assessments for Australian buildings, from open map data.

0 this week 87 Trust /100

Last scanned (13 hours ago)

Scores higher than 90% of remote servers

Reachable. Last reached 24 Nov 2026.

Category Maps and Location

Trust breakdown (7 categories)

How this component scores in each security and reliability category. Every signal is checked automatically against the live server, and we only credit what we can confirm. How we score → Why this is hard to score →

Endpoint Security80
  • The endpoint's TLS certificate is valid, in date, and uses a strong key. View diagnostics → Pass
  • No authorisation is required to call this server. Nothing on it is marked destructive, but we can't show that an anonymous caller can only read: full credit needs the server to list at least one tool and every tool to be verifiably read-only. We use a best-effort check of tool names and descriptions to tell read-only tools from tools that change things, so some genuinely read-only tools may not get full credit. Names that start with a read verb (get, list, read, search and similar) and accurate readOnlyHint annotations help. Meet that to earn full credit, or require authorisation. See how to fix → View diagnostics → Partial
  • HTTPS is enforced; there's no plaintext access path. View diagnostics → Pass
  • The HSTS (Strict-Transport-Security) header is present. View diagnostics → Pass
  • DNSSEC check failed: this domain isn't protected by DNSSEC. See how to fix → View diagnostics → Fail
Transport & Reachability100
Schema Quality & AI Usability74
  • AI-judged instruction clarity (good).Pass
  • Tool/resource definitions use about 161 tokens (~161/item across 1 items; 1 tools + 0 resources), lean.Pass
  • Usage-examples check failed: none of the tools include examples. See how to fix → Fail
Stability & Change Management100
  • No destabilizing schema changes in the last 30 days.Pass
Tool Coverage100
  • 100% of tools have a non-trivial description (not blank, and not just the tool's name).Pass
  • 100% of tool parameters carry a description.Pass
  • Structured output schemas are declared (100% of tools); any adoption earns full credit.Pass
Tool Safety100
  • No prompt-injection markers were found in the server instructions, tool names or descriptions we captured.Pass
  • We read all 1 captured tool definition(s), and no name or description among them implies an irreversible operation.Pass
  • An AI judge read all 2 captured unit(s) of tool text and found none that tries to manipulate the model reading it.Pass
Capabilities100
  • Implements a supported MCP spec version (2025-11-25); the latest is 2026-07-28.Pass
What we tested

Checks we ran (13)

  • TLS certificate
  • Authorization
  • HTTPS
  • HSTS header
  • DNSSEC
  • Transport
  • Schema quality
  • Stability
  • Tool coverage
  • Injection markers
  • Destructive annotations
  • Judged manipulation
  • MCP protocol

Does not apply to this hosted endpoint (2)

  • Supply Chain SecurityScored on package channels only. This is a hosted endpoint, so there is nothing to install or inspect.
  • Provenance & TransparencyScored on package channels only. This is a hosted endpoint, so there is nothing to install or inspect.

The score does not measure everything. What the score does not measure →

Changelog

Every change we have recorded for this component, newest first. Security-relevant changes are always shown. ▲ marks a change for the better, ▼ a change for the worse; unmarked changes are neutral.

  • 13 Nov 26 0
    • Authorization: unverified → partial ▲ security
    • Injection markers: unverified → pass ▲ security
    • Stability: unverified → pass ▲ security
    • TLS certificate: unverified → pass ▲ security
    • HSTS header: unverified → pass ▲ security
    • Transport: fail → pass ▲ security
    • Endpoint reachability: unreachable → reachable ▲ functional
    • Tool coverage: unverified → 100 ▲ functional
    • MCP protocol: unverified → pass ▲ functional
  • 12 Nov 26 0
    • Endpoint reachability: reachable → unreachable ▼ security
    • Stability: pass → unverified ▼ security
    • Authorization: partial → unverified ▼ security
    • Tool safety: pass → unverified ▼ security
    • TLS certificate: pass → unverified ▼ security
    • HSTS header: pass → unverified ▼ security
    • Transport: pass → fail ▼ security
    • Capabilities: pass → unverified ▼ functional
    • Tool coverage: 100 → unverified ▼ functional
    • First check of Schema quality: unverified functional
  • 11 Nov 26 0
    • Stability: 0.97 → pass security
  • 10 Nov 26 0
    • Stability: pass → 0.97 functional
  • 9 Nov 26 0
    • Stability: 0.97 → pass security
  • 8 Nov 26 0
    • Stability: pass → 0.97 functional
  • 6 Nov 26 0
    • We updated how we score, so this day's move reflects our rubric, not a change to the server See what changed → functional
  • 25 Oct 26 0
    • Stability: 0.97 → pass security
Diagnostics

Diagnostic detail from the automated scan of this channel: what the scanner observed at each step, so you can see exactly where a check passed or failed. It is informational only and never changes the trust score.

Captured 24 Nov 2026 · Probed https://energy-projects.com.au/mcp

TLS valid

Negotiated TLS 1.3 with TLS_AES_128_GCM_SHA256 .

Subject Issuer Valid from Valid until Key Signature Serial
CN=energy-projects.com.au CN=YR2,O=Let's Encrypt,C=US 10 Nov 2026 8 Feb 2027 RSA 2048 SHA256-RSA 5df13d6545fa5d8960905b30e20e94c02fe
SANs: energy-projects.com.au
CN=YR2,O=Let's Encrypt,C=US (CA) CN=Root YR,O=ISRG,C=US 3 Sept 2025 2 Sept 2028 RSA 2048 SHA256-RSA 4ebd24947e24d394802d84a52fd5b319
CN=Root YR,O=ISRG,C=US (CA) CN=ISRG Root X1,O=Internet Security Research Group,C=US 13 May 2026 2 Sept 2032 RSA 4096 SHA256-RSA f24b6d17f9d9ad7cb1c9fea78782699f

Background: What to check on a remote MCP endpoint →

DNSSEC insecure

Validation of energy-projects.com.au. — Not signed

Zone DS Keys Algorithms Outcome
. Trust anchor 20326, 38696 8, 8 Verified
au. DS published 26642 8 Verified
com.au. DS published 13190, 14185 8, 8 Verified
energy-projects.com.au. No DS Unsigned (proven) parent-signed NSEC/NSEC3 proves an unsigned delegation
Authentication No authorisation required

The endpoint answered without asking for a token. Anyone who knows the URL can reach it.

Result No authorisation required
HTTP status 200
Header Value
strict-transport-security max-age=63072000

Background: How OAuth 2.1 works in the 2026 MCP spec →

Transports 2 probes
Transport URL Outcome Status Location
streamable-http https://energy-projects.com.au/mcp Verified 200
http (plaintext) http://energy-projects.com.au/mcp HTTPS enforced 308 https://energy-projects.com.au/mcp
MCP tools · 1 exposed · ~136 tokens

The tools this component advertises to a client, with an estimated token cost for each. Expand a tool to see its parameters and schema. The per-tool counts are indicative and are not scored directly; the schema's total context footprint is one signal in Schema Quality & AI Usability. A tool's description is untrusted text the model reads on every call, which is what makes this list a security surface and not just an inventory: how tool poisoning works →

Tool Tokens
assess_commercial_solar_site ~136

Estimate mapped roof area, potential solar capacity, annual generation, gross energy value, and indicative Australian incentives for coordinates of a commercial building. Screening only; not engineering, financial, or eligibility advice.

NameTypeReqDescription
electricityRateAudPerKwhnumber–Electricity value used for the gross annual energy-value estimate.
latitudenumberyesLatitude of an Australian commercial building.
longitudenumberyesLongitude of an Australian commercial building.
statestring–Australian state or territory. Required only to consider state-specific incentives.
usableRoofCoveragenumber–Share of the mapped roof assumed usable for panels.
NameTypeReqDescription
assessmentIdstringyes–
assumptionsarrayyes–
caveatsarrayyes–
confidencestringyes–
generatedAtstringyes–
incentivesobjectyes–
linksobjectyes–
roof–yes–
solar–yes–
statusstringyes–
value–yes–

No examples provided.

Install

How do I install the Energy Projects AU Commercial Solar Assessment MCP server?

Energy Projects AU Commercial Solar Assessment is a hosted endpoint at https://energy-projects.com.au/mcp, so there is nothing to install locally. Ready-made configuration for Claude, Cursor, VS Code, Codex and 5 more is on this page, copied from each client's own documentation.

remote · energy-projects.com.au

# add to Claude Code
claude mcp add --transport http energyprojectsnz-commercial-solar-assessment 'https://energy-projects.com.au/mcp'
Common questions

What is the Energy Projects AU Commercial Solar Assessment MCP server?

Energy Projects AU Commercial Solar Assessment is an MCP server listed in the public MCP registry as io.github.EnergyprojectsNZ/commercial-solar-assessment. Indicative commercial rooftop solar assessments for Australian buildings, from open map data. This page covers its hosted endpoint (https://energy-projects.com.au/mcp).

Is the Energy Projects AU Commercial Solar Assessment MCP server safe to use?

Energy Projects AU Commercial Solar Assessment scores 87 out of 100 on VerifyMCP. That is a record of what we were able to check automatically, not an endorsement. The category breakdown on this page shows every signal behind the number, including the ones we could not confirm.

What tools does the Energy Projects AU Commercial Solar Assessment MCP server expose?

Energy Projects AU Commercial Solar Assessment exposes 1 tool: assess_commercial_solar_site. Their descriptions and schemas cost roughly 136 tokens of context every time the server is loaded.

Does the Energy Projects AU Commercial Solar Assessment MCP server require authentication?

No. We connected to Energy Projects AU Commercial Solar Assessment without credentials and it answered, so anything it exposes is reachable by anyone who knows the address.

Is the Energy Projects AU Commercial Solar Assessment MCP server still maintained?

Energy Projects AU Commercial Solar Assessment is still listed as active in the MCP registry. We last reached this channel on 24 November 2026. Those dates come from our own scans of the registry and the channel itself, not from anything the publisher announced.

What did VerifyMCP test on the Energy Projects AU Commercial Solar Assessment MCP server?

VerifyMCP ran 13 checks on Energy Projects AU Commercial Solar Assessment, covering TLS certificate, Authorization, HTTPS, HSTS header and 9 more. Supply Chain Security and Provenance & Transparency do not apply to a hosted endpoint, so they were not tested. The score does not measure everything, and the scoring documentation lists what it leaves out.