# Nigeria Electricity Meter MCP by Wycord (npm · @wycord/nigeria-mcp-electricity)

Read-only Nigerian electricity meter validation + DisCo list via VTpass. A Wycord product.

- Trust score: 72/100 (medium)
- Registry status: active
- Liveness: live
- Owner verified: no
- Last scored: 2026-10-22

## Components

- npm · `@wycord/nigeria-mcp-electricity`: 72/100 (this document), [markdown](https://verifymcp.io/servers/wycord-nigeria-electricity/wycord-nigeria-mcp-electricity.md), [page](https://verifymcp.io/servers/wycord-nigeria-electricity/wycord-nigeria-mcp-electricity)

## Channel facts

- Registry: `npm`
- Package: `@wycord/nigeria-mcp-electricity`
- Version: `0.4.0`
- Transport: `stdio`

## Trust breakdown

How this component scores in each security and reliability category. Every signal is checked automatically from public evidence about the published package, including repeated runs of it in an isolated sandbox, and we only credit what we can confirm. Scores are 0–100 per category. Scoring method: https://verifymcp.io/docs/scoring (what has changed: https://verifymcp.io/docs/scoring/changelog)

Scored 2026-10-22.

- **Supply Chain Security**: 98/100
  - No malware found by supply-chain analysis.
  - No known CVEs affecting this package version or its production dependencies.
  - No install/post-install scripts declared.
  - 39 of 121 dependencies flagged as unhealthy.
- **Provenance & Transparency**: 48/100
  - Source repository is publicly reachable at the declared URL.
  - Provenance check failed: no build-provenance attestation is published.
  - Clear OSI-approved license (MIT).
  - Actively maintained (last published 1 days ago).
  - Publishes a security disclosure policy (SECURITY.md).
- **Schema Quality & AI Usability**: 81/100
  - AI-judged instruction clarity (excellent).
  - Tool/resource definitions use about 158 tokens (~79/item across 2 items; 2 tools + 0 resources), lean.
  - Usage-examples check failed: none of the tools include examples.
- **Stability & Change Management**: 3/100
  - Stability observed for 1 of 30 days with no destabilising changes; credit accrues until the full window elapses.
- **Tool Coverage**: 100/100
  - 100% of tools have a non-trivial description (not blank, and not just the tool's name).
  - 100% of tool parameters carry a description.
  - Structured output schemas are declared (100% of tools); any adoption earns full credit.
- **Tool Safety**: 100/100
  - No prompt-injection markers were found in the server instructions, tool names or descriptions we captured.
  - We read all 2 captured tool definition(s), and no name or description among them implies an irreversible operation.
  - An AI judge read all 2 captured unit(s) of tool text and found none that tries to manipulate the model reading it.
- **Capabilities**: 100/100
  - Implements a supported MCP spec version (2025-11-25); the latest is 2026-07-28.

## Install

### How do I install the Nigeria Electricity Meter MCP by Wycord server?

Nigeria Electricity Meter MCP by Wycord runs locally as an npm package, launched with npx -y @wycord/nigeria-mcp-electricity. Ready-made configuration for Claude, Cursor, VS Code, Codex and 5 more is on this page, copied from each client's own documentation.

### Claude

```bash
claude mcp add wycord-nigeria-electricity -- npx -y @wycord/nigeria-mcp-electricity
```

### Cursor

```json
{
  "mcpServers": {
    "wycord-nigeria-electricity": {
      "command": "npx",
      "args": [
        "-y",
        "@wycord/nigeria-mcp-electricity"
      ]
    }
  }
}
```

### VS Code

```json
{
  "servers": {
    "wycord-nigeria-electricity": {
      "command": "npx",
      "args": [
        "-y",
        "@wycord/nigeria-mcp-electricity"
      ]
    }
  }
}
```

### Codex

```bash
codex mcp add wycord-nigeria-electricity -- npx -y @wycord/nigeria-mcp-electricity
```

### opencode

```json
{
  "$schema": "https://opencode.ai/config.json",
  "mcp": {
    "wycord-nigeria-electricity": {
      "type": "local",
      "command": [
        "npx",
        "-y",
        "@wycord/nigeria-mcp-electricity"
      ],
      "enabled": true
    }
  }
}
```

### OpenClaw

```bash
openclaw mcp add wycord-nigeria-electricity --command npx --arg -y --arg @wycord/nigeria-mcp-electricity
```

### Hermes

```yaml
mcp_servers:
  wycord-nigeria-electricity:
    command: "npx"
    args: ["-y", "@wycord/nigeria-mcp-electricity"]
```

### Netclaw

```json
{
  "McpServers": {
    "wycord-nigeria-electricity": {
      "Transport": "stdio",
      "Command": "npx",
      "Arguments": [
        "-y",
        "@wycord/nigeria-mcp-electricity"
      ]
    }
  }
}
```

### Vellum

```bash
assistant mcp add wycord-nigeria-electricity -t stdio -c npx -a -y @wycord/nigeria-mcp-electricity
```

### Other

```json
{
  "mcpServers": {
    "wycord-nigeria-electricity": {
      "command": "npx",
      "args": [
        "-y",
        "@wycord/nigeria-mcp-electricity"
      ]
    }
  }
}
```

## Changelog

Every change recorded for this component, newest first. Days that predate change tracking, or that we cannot explain, say so: "we were watching and nothing happened" and "we were not watching" are different claims.

### 2026-10-22 (score 72, +15)

- [security improvement] Malware scan: unverified → pass
- [functional improvement] Stability: unverified → 0.03

### 2026-10-21 (score 57)

First indexed and scored.

## MCP tools (2)

### `validate_meter` (~124 tokens)

Validate Nigerian electricity meter

Validate an electricity meter (read-only) and return the registered customer name/address and DisCo. Provide the meter number, DisCo code (see list_discos) and meter type. Does NOT buy power or pay bills. Example: { meter_number: '45010101010', disco: 'EKEDC', meter_type: 'prepaid' }.

Input parameters:

- `disco` (string, required): Distribution company code, e.g. EKEDC (see list_discos)
- `meter_number` (string, required): Electricity meter number
- `meter_type` (string, required): Meter type

Output parameters:

- `address` (string|null): Service address (PII — pass-through)
- `customerName` (string|null): Registered customer name (PII — pass-through)
- `disco` (string): Distribution company code, e.g. EKEDC / IKEDC / AEDC / PHED
- `meterNumber` (string): Electricity meter number
- `meterType` (string): prepaid | postpaid
- `retrievedAt` (string): ISO-8601 timestamp when the record was fetched
- `source` (string): Which provider/source served this record (e.g. 'mock', 'public', 'mono')

### `list_discos` (~34 tokens)

List Nigerian electricity DisCos

List supported Nigerian electricity distribution companies (DisCos) with their codes. Use a returned code as the disco for validate_meter.

Output parameters:

- `discos` (array)

## Diagnostics

Captured diagnostic sections: Provenance, Dependencies. The full working is on the page: https://verifymcp.io/servers/wycord-nigeria-electricity/wycord-nigeria-mcp-electricity#diagnostics

## Score history

- 2026-10-22: 72
- 2026-10-21: 57

## Common questions

### What is the Nigeria Electricity Meter MCP by Wycord server?

Nigeria Electricity Meter MCP by Wycord is listed in the public MCP registry as io.github.wycord/nigeria-electricity. Read-only Nigerian electricity meter validation + DisCo list via VTpass. A Wycord product. This page covers its npm package (@wycord/nigeria-mcp-electricity).

### Is the Nigeria Electricity Meter MCP by Wycord server safe to use?

Nigeria Electricity Meter MCP by Wycord scores 72 out of 100 on VerifyMCP. We found no known CVEs affecting it as of 22 October 2026. It declares no install or post-install scripts. That is a record of what we were able to check automatically, not an endorsement. The category breakdown on this page shows every signal behind the number, including the ones we could not confirm.

### What tools does the Nigeria Electricity Meter MCP by Wycord server expose?

Nigeria Electricity Meter MCP by Wycord exposes 2 tools: validate_meter, list_discos. Their descriptions and schemas cost roughly 158 tokens of context every time the server is loaded.

### Is the Nigeria Electricity Meter MCP by Wycord server still maintained?

Nigeria Electricity Meter MCP by Wycord is still listed as active in the MCP registry. We last reached this channel on 22 October 2026. Those dates come from our own scans of the registry and the channel itself, not from anything the publisher announced.

### What licence is the Nigeria Electricity Meter MCP by Wycord server under?

Nigeria Electricity Meter MCP by Wycord declares the MIT licence, which is OSI-approved. That covers the source only, and says nothing about the cost of any service it calls.

## Links

- npm package: https://www.npmjs.com/package/@wycord/nigeria-mcp-electricity
- Socket report: https://socket.dev/npm/package/@wycord/nigeria-mcp-electricity
- Repository: https://github.com/wycord/nigeria-mcp
- Website: https://wycord.com/
- Changelog RSS feed: https://verifymcp.io/servers/wycord-nigeria-electricity/wycord-nigeria-mcp-electricity.xml
- Changelog JSON feed: https://verifymcp.io/servers/wycord-nigeria-electricity/wycord-nigeria-mcp-electricity.json
- HTML version of this page: https://verifymcp.io/servers/wycord-nigeria-electricity/wycord-nigeria-mcp-electricity
