# Pathline Project Planner (remote · critical-path.zovo.one)

Project planning tool for critical path calculations.

- Trust score: 74/100 (medium)
- Registry status: active
- Liveness: live
- Owner verified: no
- Last scored: 2026-10-23

## Components

- remote · `critical-path.zovo.one`: 74/100 (this document), [markdown](https://verifymcp.io/servers/theluckystrike-critical-path/critical-path.md), [page](https://verifymcp.io/servers/theluckystrike-critical-path/critical-path)

## Channel facts

- Endpoint: `https://critical-path.zovo.one/mcp`
- Transports: `streamable-http`
- Auth: `none`
- Version: `1.0.0`

## Trust breakdown

How this component scores in each security and reliability category. Every signal is checked automatically against the live server, and we only credit what we can confirm. Scores are 0–100 per category. Scoring method: https://verifymcp.io/docs/scoring (what has changed: https://verifymcp.io/docs/scoring/changelog)

Scored 2026-10-23.

- **Endpoint Security**: 80/100
  - The endpoint's TLS certificate is valid, in date, and uses a strong key.
  - No authorisation is required to call this server. Every tool declares its destructiveHint and none is destructive, so open access doesn't expose one.
  - HTTPS is enforced; there's no plaintext access path.
  - The HSTS (Strict-Transport-Security) header is present.
  - DNSSEC check failed: this domain isn't protected by DNSSEC.
- **Transport & Reachability**: 100/100
  - Verified streamable-http transport via a live MCP handshake.
- **Schema Quality & AI Usability**: 77/100
  - 100% of prompts and resources have a non-trivial description (not blank, and not just the item's name).
  - AI-judged instruction clarity (good).
  - Tool/resource definitions use about 239 tokens (~119/item across 2 items; 1 tools + 1 resources), lean.
  - Usage-examples check failed: none of the tools include examples.
- **Stability & Change Management**: 3/100
  - Stability observed for 1 of 30 days with no destabilising changes; credit accrues until the full window elapses.
- **Tool Coverage**: 100/100
  - 100% of tools have a non-trivial description (not blank, and not just the tool's name).
  - 100% of tool parameters carry a description.
  - Structured output schemas are declared (100% of tools); any adoption earns full credit.
- **Tool Safety**: 100/100
  - No prompt-injection markers were found in the server instructions, tool names or descriptions we captured.
  - We read all 1 captured tool definition(s), and no name or description among them implies an irreversible operation.
  - An AI judge read all 3 captured unit(s) of tool text and found none that tries to manipulate the model reading it.
- **Capabilities**: 100/100
  - Implements a supported MCP spec version (2025-11-25); the latest is 2026-07-28.
  - Supports UI / widget rendering.

## Install

### How do I install the Pathline Project Planner MCP server?

Pathline Project Planner is a hosted endpoint at https://critical-path.zovo.one/mcp, so there is nothing to install locally. Ready-made configuration for Claude, Cursor, VS Code, Codex and 5 more is on this page, copied from each client's own documentation.

### Claude

```bash
claude mcp add --transport http theluckystrike-critical-path 'https://critical-path.zovo.one/mcp'
```

### Cursor

```json
{
  "mcpServers": {
    "theluckystrike-critical-path": {
      "url": "https://critical-path.zovo.one/mcp"
    }
  }
}
```

### VS Code

```json
{
  "servers": {
    "theluckystrike-critical-path": {
      "type": "http",
      "url": "https://critical-path.zovo.one/mcp"
    }
  }
}
```

### Codex

```toml
[mcp_servers.theluckystrike-critical-path]
url = "https://critical-path.zovo.one/mcp"
```

### opencode

```json
{
  "$schema": "https://opencode.ai/config.json",
  "mcp": {
    "theluckystrike-critical-path": {
      "type": "remote",
      "url": "https://critical-path.zovo.one/mcp",
      "enabled": true
    }
  }
}
```

### OpenClaw

```bash
openclaw mcp add theluckystrike-critical-path --url 'https://critical-path.zovo.one/mcp' --transport streamable-http
```

### Hermes

```yaml
mcp_servers:
  theluckystrike-critical-path:
    url: "https://critical-path.zovo.one/mcp"
```

### Netclaw

```json
{
  "McpServers": {
    "theluckystrike-critical-path": {
      "Transport": "http",
      "Url": "https://critical-path.zovo.one/mcp"
    }
  }
}
```

### Vellum

```bash
assistant mcp add theluckystrike-critical-path -t streamable-http -u 'https://critical-path.zovo.one/mcp'
```

### Other

```json
{
  "mcpServers": {
    "theluckystrike-critical-path": {
      "type": "http",
      "url": "https://critical-path.zovo.one/mcp"
    }
  }
}
```

The mcpServers block is a cross-client convention. Remote transports vary, so check your client's docs.

## Changelog

Every change recorded for this component, newest first. Days that predate change tracking, or that we cannot explain, say so: "we were watching and nothing happened" and "we were not watching" are different claims.

### 2026-10-23 (score 74, 0)

- [functional improvement] Stability: unverified → 0.03

### 2026-10-22 (score 74)

First indexed and scored.

## MCP tools (1)

### `calculate_critical_path` (~181 tokens)

Calculate critical path

Use this when the user wants a critical path calculation, project duration, earliest/latest task starts and finishes, or task slack from explicit durations and dependencies. Accepts one to forty tasks, at most 160 finish-to-start dependencies, and durations with at most three decimal places. Includes parallel critical tasks and a CSV schedule. Does not schedule calendar dates, generate Gantt charts, account for resources or holidays, or infer missing task durations.

Input parameters:

- `project` (string): Project label, e.g. Website launch.
- `tasks` (array, required): Tasks in any order, e.g. [{"id":"A","duration":3},{"id":"B","duration":5,"depends_on":["A"]}].
- `unit` (string): A single elapsed-time unit for all task durations, e.g. days. Defaults to days; no business calendar is applied.

Output parameters:

- `critical_tasks` (array)
- `downloads` (object)
- `notes` (array)
- `one_critical_path` (array)
- `project` (string)
- `project_duration` (number)
- `schedule_preview_only` (boolean)
- `task_count` (number)
- `tasks` (array)
- `unit` (string)

## Diagnostics

Captured diagnostic sections: TLS, DNSSEC, Authorisation, Transports. The full working is on the page: https://verifymcp.io/servers/theluckystrike-critical-path/critical-path#diagnostics

## Score history

- 2026-10-23: 74
- 2026-10-22: 74

## Common questions

### What is the Pathline Project Planner MCP server?

Pathline Project Planner is an MCP server listed in the public MCP registry as io.github.theluckystrike/critical-path. Project planning tool for critical path calculations. This page covers its hosted endpoint (https://critical-path.zovo.one/mcp).

### Is the Pathline Project Planner MCP server safe to use?

Pathline Project Planner scores 74 out of 100 on VerifyMCP. That is a record of what we were able to check automatically, not an endorsement. The category breakdown on this page shows every signal behind the number, including the ones we could not confirm.

### What tools does the Pathline Project Planner MCP server expose?

Pathline Project Planner exposes 1 tool: calculate_critical_path. Their descriptions and schemas cost roughly 181 tokens of context every time the server is loaded.

### Does the Pathline Project Planner MCP server require authentication?

No. We connected to Pathline Project Planner without credentials and it answered, so anything it exposes is reachable by anyone who knows the address.

### Is the Pathline Project Planner MCP server still maintained?

Pathline Project Planner is still listed as active in the MCP registry. We last reached this channel on 23 October 2026. Those dates come from our own scans of the registry and the channel itself, not from anything the publisher announced.

## Links

- Remote endpoint: https://critical-path.zovo.one/mcp
- Website: https://critical-path.zovo.one/
- Changelog RSS feed: https://verifymcp.io/servers/theluckystrike-critical-path/critical-path.xml
- Changelog JSON feed: https://verifymcp.io/servers/theluckystrike-critical-path/critical-path.json
- HTML version of this page: https://verifymcp.io/servers/theluckystrike-critical-path/critical-path
