# io.github.theluckystrike/change-order (mcpb · change-order.mcpb)

Change orders against a quote or work order: deltas, approval, running contract value.

- Trust score: 47/100 (low)
- Registry status: active
- Liveness: live
- Owner verified: no
- Last scored: 2026-09-20

## Components

- remote · `mcp.zovo.one`: 84/100, [markdown](https://verifymcp.io/servers/theluckystrike-change-order/mcp-change-order.md), [page](https://verifymcp.io/servers/theluckystrike-change-order/mcp-change-order)
- mcpb · `change-order.mcpb`: 47/100 (this document), [markdown](https://verifymcp.io/servers/theluckystrike-change-order/https-github-com-theluckystrike-mcp-servers-releases-download-v0-22-0-change-ord.md), [page](https://verifymcp.io/servers/theluckystrike-change-order/https-github-com-theluckystrike-mcp-servers-releases-download-v0-22-0-change-ord)

## Channel facts

- Registry: `mcpb`
- Package: `https://github.com/theluckystrike/mcp-servers/releases/download/v0.22.0/change-order.mcpb`
- Version: `0.22.0`
- Transport: `stdio`

## Trust breakdown

How this component scores in each security and reliability category. Every signal is checked automatically from public evidence about the published package, including repeated runs of it in an isolated sandbox, and we only credit what we can confirm. Scores are 0–100 per category. Scoring method: https://verifymcp.io/docs/scoring (what has changed: https://verifymcp.io/docs/scoring/changelog)

Scored 2026-09-20.

- **Supply Chain Security**: 22/100
  - Malware scan not yet available for this package.
  - Known CVEs were checked across the 157 of 157 dependencies we could resolve, so this covers what we could see, not the whole tree.
  - No install/post-install scripts declared.
  - 63 of 157 dependencies flagged as unhealthy (2 deprecated).
- **Provenance & Transparency**: 45/100
  - Source repository is publicly reachable at the declared URL.
  - Provenance check failed: no build-provenance attestation is published.
  - Clear OSI-approved license (MIT).
  - Actively maintained (last published 3 days ago).
  - Disclosure check failed: no security disclosure policy was found in the source repository.
- **Schema Quality & AI Usability**: 84/100
  - 100% of prompts and resources have a non-trivial description (not blank, and not just the item's name).
  - AI-judged instruction clarity (excellent).
  - Context-footprint check failed: tool/resource definitions use about 1532 tokens (~127/item across 12 items; 11 tools + 1 resources), over budget; trim descriptions and params.
  - Usage-examples check failed: none of the tools include examples.
- **Stability & Change Management**: 0/100
  - Stability not yet verified: not enough scan history yet (needs a 30-day window).
- **Tool Coverage**: 98/100
  - 100% of tools have a non-trivial description (not blank, and not just the tool's name).
  - 95% of tool parameters carry a description.
- **Tool Safety**: 75/100
  - No prompt-injection markers were found in the server instructions, tool names or descriptions we captured.
  - 0 of 1 tool(s) whose name or description implies an irreversible operation declare an MCP destructiveHint annotation; "change_order_delete" implies "delete" and declares no destructiveHint at all, which the MCP spec reads as destructive by default.
  - An AI judge read all 12 captured unit(s) of tool text and found none that tries to manipulate the model reading it.
- **Capabilities**: 100/100
  - Implements a supported MCP spec version (2025-11-25); the latest is 2026-07-28.

**Unverified: 1 category.** A category scored 0 because we could not verify it: a data source with nothing on this package, evidence we could not reach, or a check we could not run. We only credit what we can confirm.

## Install

- Download bundle: `https://github.com/theluckystrike/mcp-servers/releases/download/v0.22.0/change-order.mcpb`

## Changelog

Every change recorded for this component, newest first. Days that predate change tracking, or that we cannot explain, say so: "we were watching and nothing happened" and "we were not watching" are different claims.

### 2026-09-17 (score 47)

First indexed and scored.

## MCP tools (11)

### `change_order_create` (~295 tokens)

Raise a change order

Raise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open.

Input parameters:

- `client` (string, required): The client the change is agreed with, as named on the quote or work order
- `currency` (string): ISO code the contract is priced in. Defaults to the shared business profile's currency
- `date` (string): The day the change was raised, YYYY-MM-DD. Default today
- `duplicate_ok` (boolean): Raise it even though an identical change order exists on this reference. Default false
- `note` (string)
- `original_value_minor` (integer): The contract value BEFORE any change order, net of VAT, in whole minor units. Required on the first change order against a reference; inherited by every later one
- `reference` (string, required): The quote or work order this change order is against, by its id, e.g. Q-2026-0003 or WO-2026-0001
- `reference_kind` (string): What the reference is. Inferred from the id when omitted: WO-... is a work order, anything else a quote
- `title` (string, required): What the change is, in one line, e.g. Add a second landing page and drop hosting

### `change_order_add_line` (~316 tokens)

Add a changed line

Add one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free.

Input parameters:

- `change_order` (string, required): The change order id, e.g. CO-2026-0001, or its title when only one carries it
- `date` (string): The day the change was asked for, YYYY-MM-DD. Default the change order's date
- `description` (string, required): The line as it reads on the quote or work order, e.g. Website audit
- `kind` (string, required): added for new work, removed for work taken out, changed for a line whose quantity or price moves
- `note` (string)
- `quantity` (number, required): added or removed: how many. changed: the NEW quantity
- `reason` (string, required): Why, in the client's words if you have them, e.g. Client asked for a second page after the kickoff
- `tax_rate` (number): VAT percent for this line, overriding the shared profile's default
- `unit_price_minor` (integer, required): added or removed: the unit price in whole minor units. changed: the NEW unit price. 45000 is EUR 450.00
- `was_quantity` (number): changed only: the quantity before the change
- `was_unit_price_minor` (integer): changed only: the unit price before the change, in whole minor units

### `change_order_status` (~142 tokens)

Move a change order along

Move one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused.

Input parameters:

- `change_order` (string, required): The change order id, e.g. CO-2026-0001, or its title when only one carries it
- `date` (string): The day it happened, YYYY-MM-DD. Default today
- `note` (string): What happened, e.g. Emailed to the client, or Approved by phone, confirmed in writing
- `status` (string, required): The status to move to

### `change_order_get` (~86 tokens)

Show one change order

Return one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list finds the id.

Input parameters:

- `change_order` (string, required): The change order id, e.g. CO-2026-0001, or its title when only one carries it

### `change_order_list` (~144 tokens)

List change orders

List change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client, date.

Input parameters:

- `client` (string): Only change orders whose client name contains this text
- `from` (string): Earliest date, YYYY-MM-DD
- `limit` (integer): Maximum rows returned, default and ceiling 500
- `reference` (string): Only change orders against this quote or work order
- `status` (string): One status, or open for draft and sent together
- `to` (string): Latest date, YYYY-MM-DD

### `change_order_delete` (~90 tokens)

Delete an empty draft

Delete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number is not reissued.

Input parameters:

- `change_order` (string, required): The change order id, e.g. CO-2026-0001, or its title when only one carries it

### `contract_value` (~90 tokens)

Running contract value

The running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused.

Input parameters:

- `reference` (string, required): The quote or work order this change order is against, by its id, e.g. Q-2026-0003 or WO-2026-0001

### `change_order_document` (~82 tokens)

Change order document

Render one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. Pro.

Input parameters:

- `change_order` (string, required): The change order id, e.g. CO-2026-0001, or its title when only one carries it

### `change_order_invoice_payload` (~126 tokens)

Invoice payload for an approved delta

Build the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro.

Input parameters:

- `change_order` (string, required): The change order id, e.g. CO-2026-0001, or its title when only one carries it
- `issue_date` (string): The invoice issue date, YYYY-MM-DD. Default today
- `tax_rate` (number): VAT percent for lines with no rate of their own, overriding the shared business profile's default

### `license_status` (~54 tokens)

License status

Report this server's licence state: product, tier free or pro, licence id, expiry, the key source and the upgrade URL. No arguments, no network. Explains a free-tier refusal; license_activate installs a key.

### `license_activate` (~71 tokens)

Activate license

Activate a Pro key (MCPL1.xxx.yyy) from checkout: verified offline against a built-in public key, saved to your config file. A wrong, malformed or expired key is refused, unsaved. license_status reads it back.

Input parameters:

- `key` (string, required): License key from the checkout confirmation page

## Diagnostics

Captured diagnostic sections: Provenance, Dependencies. The full working is on the page: https://verifymcp.io/servers/theluckystrike-change-order/https-github-com-theluckystrike-mcp-servers-releases-download-v0-22-0-change-ord#diagnostics

## Score history

- 2026-09-20: 47
- 2026-09-19: 47
- 2026-09-18: 47
- 2026-09-17: 47

## Common questions

### What is the io.github.theluckystrike/change-order MCP server?

io.github.theluckystrike/change-order is an MCP server listed in the public MCP registry as io.github.theluckystrike/change-order. Change orders against a quote or work order: deltas, approval, running contract value. This page covers its MCPB bundle (https://github.com/theluckystrike/mcp-servers/releases/download/v0.22.0/change-order.mcpb).

### Is the io.github.theluckystrike/change-order MCP server safe to use?

io.github.theluckystrike/change-order scores 47 out of 100 on VerifyMCP. It declares no install or post-install scripts. That is a record of what we were able to check automatically, not an endorsement. The category breakdown on this page shows every signal behind the number, including the ones we could not confirm.

### What tools does the io.github.theluckystrike/change-order MCP server expose?

io.github.theluckystrike/change-order exposes 11 tools: change_order_create, change_order_add_line, change_order_status, change_order_get, change_order_list, and 6 more. Their descriptions and schemas cost roughly 1,496 tokens of context every time the server is loaded.

### What licence is the io.github.theluckystrike/change-order MCP server under?

io.github.theluckystrike/change-order declares the MIT licence, which is OSI-approved. That covers the source only, and says nothing about the cost of any service it calls.

## Links

- Repository: https://github.com/theluckystrike/mcp-servers
- Website: https://mcp.zovo.one/s/change-order
- Changelog RSS feed: https://verifymcp.io/servers/theluckystrike-change-order/https-github-com-theluckystrike-mcp-servers-releases-download-v0-22-0-change-ord.xml
- Changelog JSON feed: https://verifymcp.io/servers/theluckystrike-change-order/https-github-com-theluckystrike-mcp-servers-releases-download-v0-22-0-change-ord.json
- HTML version of this page: https://verifymcp.io/servers/theluckystrike-change-order/https-github-com-theluckystrike-mcp-servers-releases-download-v0-22-0-change-ord
